Capital Projects

The Engineering Department is implementing projects from the 2008-2012 Capital Improvement Program in the area of public infrastructure (roads, utilities and drainage). The ever-increasing challenges of our growing, thriving community have necessitated improvements in all categories.

Jump to:
  1. Road Projects
  2. Utilities/Drainage Projects
  3. City Facility Projects

Road Projects

Allen Drive/US 75 Interchange Improvements
Alma and Ridgeview Drive Roadway Improvements
Buckingham Lane and Highpoint Drive Asphalt Rehabilitation
2022 Streets and Alleys Rehabilitation
Traffic Signal Design and Construction
  • Locations: Bethany Drive at Racetrac Driveway; Angel Parkway and Malone Road; Stacy Road and Curtis Lane
  • Construction anticipated summer 2022
  • Project Manager: Asma Tuly
TXDOT Project - FM 2551/Angel Parkway
TXDOT Project - US 75 at Ridgeview Drive Overpass
TXDOT Project - US 75 Peak Hour Lane/High Mast Illumination
DART Rail Service

Utilities/Drainage Projects

Windridge Water/Sanitary Sewer Rehabilitation (Phase 2)
24-Inch Sloan Creek Waterline
Sloan Creek Trunk Sewer and Lift Station
Advanced Meter Infrastructure (AMI) - Development Services
Stacy Pump Station Rehabilitation
Manhole Investigation and Rehabilitation (Watters Creek and Cabela's)
Bank Stabilization Project

City Facility Projects

Allen Fire Station #6
Don Rodenbaugh Natatorium HVAC Replacement (Phase 2)
Allen Police Department Headquarters: Parking Lot Fence
Allen Police Department Headquarters: Air Handler
  • Project awarded by Council; construction begins fall 2022
  • Project Manager: Ashley McDaniel